My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-16-2002 Planning Packet
Orono
>
Planning Commission
>
2002
>
09-16-2002 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 4:27:19 PM
Creation date
2/16/2023 4:24:39 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Monday, August 19,2002 <br />6:30 oVIock p.m. <br />(#02-2782 ORONO PROFESSIONAL PROPERTIES, Continued) <br />Gaffron stated that if the Commission recommends the lot line be moved, it would be feasible to <br />put the dumpster in a central location on the property. One enclosure for the two properties. <br />Smith stated that she could support this alternative. <br />Hawn stated that moving the lot line would be consistent with what they have done in the past. <br />Hawn moved, to recommend City Council approval of Application #02-2782, Professional <br />Properties of Orono, 2755 Kelley Parkway, granting approvai of the new site plan, <br />entrance facing Kelley Parkway, with respect to the trail. City Council work toward <br />development of the trail in conjunction with the other properties, and the Applicants place <br />in escrow the funds for its construction. <br />Mabusth added that City Council be given the options, to develop the trail now if it <br />chooses, construct it upon development of the easterly properties from Willow to Old <br />Crystal Bay Road, or with the final resolve and design of the County Road once Highway <br />12 no longer exists; however, of the alternatives, the Commission would recommend <br />deferring trail completion until a comprehensive trail plan can be developed. <br />Hawn moved that, furthermore, the lot line be moved to include the east parking lot, and <br />the dumpster be allowed to be placed at the southeast corner of the new ly created lot; of <br />particular concern to the Commission is to ensure the backside and southwest corner of the <br />building be landscaped; and, if possible, the traffic flow be improved by creating another <br />cut in the adjacent property as soon as possible <br />Bremer stated that she was concerned that the financial implications to the applicant if the <br />Commission docs not allow them to wait and defer trail construction until a comprehensive plan <br />can be developed could be a bit onerous. She felt forcing the applicant to remove and change a <br />trail they were only recently required to construct would place undue burden on the applicant <br />down the road. <br />VOTE: Aves 6, Navs 0. <br />(#3) #02-2801 KATHY MELIN, 3309 CRYSTAL BAY ROAD, VARIANCES 7:21 p.m. <br />7:48 p.m. <br />Applicant Kathy Mclin and Bob Koelfgen, Metro Handyman, were present. <br />PAGE 8 of 28
The URL can be used to link to this page
Your browser does not support the video tag.