Laserfiche WebLink
r <br />RRT <br />Camp Tpkn RRT Project #0206 QA <br />Bob Shiff <br />Chip LIndeke <br />Conditional Use Permit Project Descriptions <br />20 August 2002 <br />PROJECT -----—- -------------------- MEMO <br />TO <br />FROM <br />SUBJECT <br />DATE ___________________________ <br />PRESENT <br />Camp Teko. 645 Tonkawa Road. Orono. MN <br />Conditional Use Permit - Project Descriptions <br />See attached site drawings illustrating th? proposed improvements described below. See also <br />attached Landform 8/7/02 letter (revised 8/9/02) to Minnehaha Creek Watershed District regarding <br />Camp Teko Hydrology. Please note that an application has been made for a permit to the Watershed <br />District. <br />Building Project No. 1 - 2800sf (approximate size - final size may vary by W'SOOsQ addition to <br />existing dining hall building, 1400 sf at each of two levels, matching floor level/height/materials of <br />existing building, entry at lower level. Existing toilet wing to be removed (600 sf footprint) and <br />replaced by wood deck. Existing building will have minor Interior and exterior renovations. The <br />landscaping for the addition will consist of restoring the existing grass lawn in either sod or seed. No <br />additional site lighting is planned as a part of the addition, other than some exterior building flood <br />'lights, which will be used to provide illumination immediately around the addition. See attached site <br />plan, floor plans, and exterior elevation drawings illustrating the proposed addition. <br />Building Project No. 2 (already approved in a previous Conditional Use Permit, May 2002) - 40’ x <br />60’ open sided, one story picnic pavilion, on 48’ x 68’ concrete slab on grade, also includes 8’ x 12’ <br />concrete barbeque slab. <br />Building P >ject No. 3 - Repairs to existing open air chapel benches, railing/fence, stage/pulpit. <br />Trail Project No. 1 - Concrete steps with railings from existing paved parking lot to building project <br />no. 1 entry, gravel path from existing gravel path to building project no. 1 entry - ♦/-120’ path. <br />Trail Project No. 2-5’ wide gravel paths from existing parking lot to existing sport court, nature <br />center building - ♦/• 250’ path. <br />Trail Project No. 3 (already approved in a previous Conditional Use Permit, May 2002) - 5’ wide <br />gravel paths interconnecting building project no. 2 with other parts of camp - ♦/- 500' path. <br />Trail Project No. 4-5’ wide gravel path interconnecting building project no. 2 with existing chapel - <br />+/• 250’ path. <br />RAFFERTY RAFFERTY TOLLEFSON ARCHITECTS <br />253 EAST 4TH STREET SAINT PAUL. MINNESOTA SSlOl • 1632 <br />TEL 651 224-4831 FAX 651 228 0264 <br />A « A m.,m> «t..<r ».. *• t «»—•.«««>«