My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-04-2002 Planning Packet
Orono
>
Planning Commission
>
2002
>
09-04-2002 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 4:25:25 PM
Creation date
2/16/2023 4:24:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tfisn\ Cfisne. wfirsizcup p^/e/cr <br />S/^/o-z. <br />et/^ <br />„ . ^ CONSENT <br />Permit Application No.: 02-2<t4 <br />Applicant: _ _ Camp Teko . Tcmplr! T<r«^ <br />Project: Camp Iniprovgm^i^^^_____ <br />Location: _____645 Tonkawa Rnad. Omn^ <br />Rule: B/D/F/N <br />Jleccived: 07/24/02 <br />Complete: 08/00/02 <br />Notification: 08/12/02 <br />Recommendation: ———————---------------------------------------------- <br />Approval. Permit should not be issued until the following conditions ore met: <br />I. Reimbursement of mailing costs <br />2 Payment of Rule J fees <br />3. Submit a declaration for the preservation o*‘ /etland buffers, filter strips and vegetated <br />_____swales which must be executed and recorded <br />Background: <br />The applicant is proposing to construct improvements on an 18.4-acre lot at the address listed <br />above in the City of Orono. The proposed project involves the construction of a 1400 square <br />fom building addition, new paviilion. ADA accesses, expansion of gravel trails, and shoreline <br />stabihzaUon. *^0 wetlands currently exist on site and will not be impacted by fillmg or <br />excavation activities as a result of tWs project. Permits would allow for the construction of <br />buildings, impervious surface, shoreline improvements and establishment of wetland buffersRuleB: <br />Erosion control coitsisting of silt fence and inlet protection has beat provided throughout the <br />Rule D: <br />As stated above two Type 3 wetlands of less than one acre in size currently exist on site and will <br />not be impacted from filling or excavation as a result of this project. The applicant has to <br />declare two 16.5-foot buffers around the boundaries of delineated wetlands in accordance with <br />Rule D. <br />RuleF: <br />^e applicant has proposed to stabilize approximately 350 feet of shoreline with rip rap <br />Cuwntly the shoreline is stabilized with vegetation, however, the appUcant cites erosion <br />problems as a need to install rip rap to better armor the shoreline. Rip rap will be placed at a <br />3H:1 V slope and consist of Class III-TV rock which complies with MCWD Rule F fast-track <br />criteria. <br />Rule N; <br />The applicant has proposed a total increase in impervious surface of 13,700 square feet with the <br />proposed project. The proposed trails will be no greater than 10 feet in width with adjacent five- <br />fool pervious buffers and therefore will not be subject to Rule N requirements. In accordance <br />with Rule N. water quaUty, rate control and BMP requirements wiU be assessed in regards to the <br />mercase m impervious. Runoff rate analysis shows that the proposed runoff from major rain <br />events routed overland to swales and filler strips will not increase as a result of the project. <br />Drainage will be routed through existing filter strips and created swales which are designed to <br />perform water quality treatment through infiltration and retention. The swales and filter strips <br />Will accommodate drainage from both existing and proposed impervious surface. Because these <br />measures exceed MCWD requiremeals, staff has determined the ^plication to be in compliance
The URL can be used to link to this page
Your browser does not support the video tag.