Laserfiche WebLink
TO: Chair Smith and Orono Planning Commission Members <br />FROM: Wendy Bottenberg, Zoning Administrator/Planner <br />DATE: July 16.2002 <br />SUBJECT:#02-2805 Carson Erickson <br />3415 Eastlakc Street <br />Variances -- Public Hearing <br />Zoning District: <br />Lot Area: <br />LR-1A One Family Lakeshore Residential District (2 acre) <br />10,200 s.f. (.23 acre) (9,987 s.f. e.\cluding area in 929.4') <br />List ol* Exhibits: <br />A Revised Site Plan <br />B Analysis Worksheet <br />Application Summary ’: Application was heard at the July 15,2002 Planning Commission <br />meeting. The application was table with direction given to the applicant's representative. The <br />applicant has submitted a new site plan with those changes. The applicant has met all the <br />conditions. The variances are listed below and the new changes are new proposed. An <br />additional variance for side yard setback is required. <br />Planning Commission directions for the new residence: <br />1. Be 13 ’ from street property line. <br />2. Be 50'from 929.4'. <br />3. Be up to 20' from side yard property lines. <br />4. The deck to be a maximum of 300 s.f./lO’ from house/42' from 929.4' <br />V'ariances required; <br />1 . Section 10.23. Subd 6 (B): Variances requested to lot area and lot width to permit construction <br />of a new residei.ee on the property in the LR-1 A district less than 2 acre and 200' width. The <br />defined lot area .’s 9.987 s.f. absent the area below the 929.4'. The defined lot width is 100' at the <br />lakeshore and at :he defined structure setback. <br />2. Sccti»~n 10.55. Subdivision 8, Section 10.22. Subd. land 2, and Section 10.56, Subd. 16(L) <br />land 2: Variances requested for hardcover and structure within 75’ of the 929.4’, where no <br />hardcover or structure is allowed and hardcover in excess of the allowed 25% in the 75-250' <br />setback zone. <br />Total Area 0-75' = 7.500 s.f. <br />Allowed 0-75' = 0 s.f. <br />Proposed 0-75' = 1.473 s.f. (19.6%) <br />•♦New Proposed 0-75’ - 1,219 s.f. (16.25%) <br />Total Area 75-250’ = 2,487 s.f <br />Allowed 75-250’ = 621.75 s.f <br />Propo.sed 75-250’ = 710 s.f (28.5%) <br />••New Proposed 75-250’ = 760.5 s.f (30.58%)