Laserfiche WebLink
^ 1 Bonestroo <br />Bosene <br />V ■ Anderlik & <br />I Associates <br />Engineers & Architects <br />May 9.2002 <br />Mr. Mike Gaffron <br />Planning Director <br />City of Orono <br />Post Office Box 66 <br />Crystal Bay. MN 55323 <br />FBoncitroo. Roicne. Anderlik and Atiociates. Inc. It an Affirmative Action, Equal Opportunity Employer <br />and Employee Owned <br />Principals: Otto G flenestroo PE • V.irvinL Sorvaia. P£ • Giern R Cook P£ • TcOe^t G Schunicht P£ • <br />Jrff/ A Bjurdon P£ <br />Senior Coniultantt: RoPert W Rosene. P£ • Joseph C Anderlik. P£ • Richard £ rur.*er Pf • Susan V £t>erfm. C PA <br />Associate Principals: Keith A Gordon. Pf. • Robert R Pfeffene PE • Richard W Foster Pf • David O Loskoia PE • <br />Mark A Hanson Pf • Michael T Rautmann. P£ • Ted K field. Pf • Kervseih P Anderson, Pf • M.irn R Rolfs. P£ • <br />David A Bonestroo MB A • Sidney P Williamson. P£ . L S • Agnes M Ring MB A • Allan Rick Schmidt P£ • <br />Thomas W Peterson PC • James R Maland »*£ • Miles B Jenicn. P£ • L Phiit.p Gravel ill Pf • Daniel J Edgerton Pf • <br />Ismael Martinez Pf • Thomas A Syfko Pf • Sz^eidon J Johnson • Dale A Grove Pf • Thomas A Roushar. P£ • <br />Robert J Uevery P£ <br />Offices: St Paul St Cloud Rochester and Wilimar MN • Milwaukee Wl • Chicago It <br />VMrbsite; www bonestroo com <br />^^jATthAg/siTir Arif- <br />^ i ttvC i <br />Rc: - Orono Pla/a PUD Concept Plan <br />File No. 139-02-000 <br />Plat No. 02-2789 <br />Dear Mike: <br />We have reviewed Ihe PUD concept plan for the proposed Orono Pla/a do vclopmcni The site is locnicd in *he northwest <br />quadrant ot the intersection of Willow Drive and TH 12. The proposal provides for a mix of residential houMPg and <br />commercial development. We have the following comments in regards to engineering mailers. <br />]. Sanitary Sew er: Sanitary sewer flovv^ from the sue will be rouicd ic an existing saniiar;. sewer along ihc nonh sule <br />of TH 12. The existing sanitary sewer then flows southerly under TH 12 through a line just west of the Golf Dome <br />property. This line serves an area north of TH 12 including the public schools along Old Cry stal Bay Road, the <br />NV illou \ lew subdivision and the Medina Morningside neighborhood in NIedina. Prior to the consiniciion of the new <br />Orono Middle School this sanitary line was nearly at capacity. The City recently constructed a bypass lift station <br />along the south side of T.H. 12 to provide temporary relief for the additional flows generated by the school. During <br />peak flow limes the bypass lift station pumps into an existing MCES forcemain along the Nouih side of TH 12. The <br />lift station was an interim measure and will remain in operation until the downstream infrastructure is upgraded to <br />provide the necessary capacity. Currently the system is at capacity and cannot accummvHJaic the additional flows <br />generated by the proposed development until the system is upgraded downstream from the bypass lift station. <br />Improvements to the existing sanitary line between the bypass lift station and the railroad tracks to the south would <br />need to be a City project. The applicant should review costs for these impiovemeni^ with the City It is cur <br />understanding the system along the railroad tracks and lo the cast will be upgr.idcd as par of the propey:d .MNMX)T <br />IH 1^ improvement project. MN/DOT should be consulted to determine when the proposed sanitary sewer <br />improvements will be completed and to verify that the necessary capacity will t>e provided Sar.uar.v sewer shall be in <br />installed in accordance with City standard deiaiis. Final plans should include plan and profile views of all saniiaA^ <br />sewer. <br />2. ater Main; The propc>scd w ater m.ain from west to exst should l^e 12 ” DIP. The liignment of the 12 * mam should <br />follow’the alignment of the proposed Kelley Parkway. Water mam design thro’jghoui the .es: of the project appears <br />acceptable. The two water mam laterals serving the units north of Kelley Parkway should be looped Final plans <br />should include plan and profile views of the proposed water mam. water main dciafs and service locations <br />3. Storm Sevstr: The draft version of the City's Surface Water Management Plan (SWMP) ^hows that this site lies <br />w ithin the Long Lake drainage district. The narrative prov ided w iih the application propo>es to expand the existing <br />M.\'/DOT ponds ah>ng the south side of the sue As pari of the expansion the improvements propase to lower the <br />normal water level of the pond by installing a new outlet pipe approximately 3-feei lower than the existing outlet <br />pipe The existing pond outlet pipe discharges on the south side of TH 12 Storm water then flows overland through <br />a tlrainage ditch along the west side ot the Golt Dome property The drainage ditch is very flat and the Golf Dome <br />experiences occasional flooding during heavy ram events. The developer should provide additional infomiationosto <br />where and at what elevation the proposed outlet will discharge south of TH 12. A minimum of 2-feet of freeboard <br />should be prov ided between all basement cIcvationF and pond high water levels. The City has ‘^lorm sewer near the <br />propiised westerly pond .Additional details such as connections to the City storm sewer, proposed emergency <br />overflows and discharge ptunts should be provided for the pond along the wot boundary All storm ^ewer within <br />2335 West Highway 36 • St. Paul. MN 55113 ■ 65F636-4600 • Fax. 65F636-I31I