My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-17-2002 Planning Packet
Orono
>
Planning Commission
>
2002
>
06-17-2002 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 4:02:14 PM
Creation date
2/16/2023 3:59:57 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Apri 17. 2002 <br />A breakdown of the major construction costs associated with the regional pond and trunk <br />storm sewer is show n on an attached exhibit The trunk line will provide scrv ice to the two <br />undeveloped lots to the west of the Orono Village site. The natural drainage patterns of the <br />remainder of the basin will remain largely unchanged as storm runoff is routed through the <br />new regional pond. <br />We respectfully request that the City assist us in our negotiations with MN/DOT for the <br />construction of these facilities and that Trunk Storm Sewer fees be used w here appropriate to <br />fund this project. <br />#27 oo 1*
The URL can be used to link to this page
Your browser does not support the video tag.