Laserfiche WebLink
LANDFORM <br />Orono Village Regional Pond <br />Oronu, Minnesota <br />Enoine«r*t Prttfmlnary Opinion of Probable Construction Costs <br />OcMriptioD . Units Unit Price Quantity -Item Cost <br />RcfbNialPeed <br />Common Excavation CY S3.00 30,000.0 $90,000 <br />Jack/Dorc24"RCP •LF S400.00 120.0 $48,000 <br />48* Outlet Control Slnicture EA S2.000.00 1.0 $2,000 <br />36* RCP Stonn Sewer LF $50.00 1,130.0 $56,500 <br />Seed AC $900.00 4.0 $3,600 <br />SUBTOTAL $200,100 <br />30% Contingency (Design, Adminislration, etc.)$60,030 <br />GRANDTOTAL $260,130 <br />: <br />regionai pond estimates.xls <br />Eitfimir F <br />fI <br />r