My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-17-2002 Planning Packet
Orono
>
Planning Commission
>
2002
>
06-17-2002 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 4:02:14 PM
Creation date
2/16/2023 3:59:57 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The current plan shows 71 standard stalls plus 4 handicap stalls. The minimum requirement is met, <br />and a few stalls could technically be eliminated. Applicants arc concerned about parking due to the <br />daily high patient turnover for orthodontics, and would prefer to not lose stalls. Again the issue is <br />loss of green space to ser\ c those stalls. <br />Stormwater Management - Easements Needed <br />Applicant proposes to discharge stormwater to the regional ponding area proposed by Dahlstrom <br />Development LLC to the cast along Highway 12. The applicants proposal relies heavily on that pond <br />being developed, since no stormw'atcr storage facilities are being provided on site. This is a v iable <br />plan as long as the regional pond is constructed in a timely fashion. See City Engineer Tom <br />Kellogg's comments also in relation to stormwater ntanagemcnl (Exhibit D). The applicants w ill <br />potentially have to obtain casements over the properties to the cast based on their draft utility plan. <br />The stom- vater management issues may ultimately pose some scheduling problems for U.c rpp’tca :* <br />Stormwater Drainage Trunk Fee <br />This new development will be subject to the City ’s recently enacted Storm Water Trunk Fee. At the <br />current 2002 Fee Schedule commercial rate of $6,480 per acre, the site w ill be charged for 2 0 acres <br />or a total fee of $12,960. <br />Trails and Park Dedication <br />The proposed site plan indicates the location of the existing Ciiy/Counly trail along OCB Rd. w hich <br />Orono wants to remain os-is in its current location. An easement for that trail w ill be defined and <br />dedicated prior to the sale of the properly to the applicant. <br />The proposal indicates a 6* sidewalk w ithin the Kelley Parkway right-of-way. leaving a 4* green <br />boulevard to Kelley and a 1 O' setback to parking on-site. The City has not established standards for <br />sidewalk width along Kelley Parkway. A six-foot sidewalk may be adequate, however, we have 8 ’ <br />in areas along Highway 12... <br />The sidew alkarail proposed along Highw ay 12 south of the property appears to be located south of <br />liic road ditch. This sidewalk should be north of the ditch, tucked up against the south property <br />boundary, and 8* in w idlh to match those walks further cast along 12. <br />In reviewing the Park Dedication ordinance, staff notes that in 1998 the ordinance was amended to <br />require that all planned unit developments arc subject to park dedication. While this language is in <br />the subdivision code, the current proposal is not a subdivision, hence the Council will have to <br />interpret whether this application is subject to park dedication. The ordinance reads as follows: <br />«02-27a3 rrofmtoul Prvpmtn of Oroaa <br />May 17,2002 <br />rates of 7
The URL can be used to link to this page
Your browser does not support the video tag.