Laserfiche WebLink
1 <br />/f<y o <br />A t <br />\\ <br />GITYoT ORONO <br />/ /■ <br />of <br />Municipal Offices <br />SlTMt Mdrtss: <br />2750 itelley Parkway <br />Orono, MN 55356 <br />HaWag Mdftss: <br />P.O. Box 66 <br />Crystal Bay, MN 55323 0066 <br />TO:Wendy Bottenberg <br />FROM:Matt Bolterman, On-Site Systems Manager <br />DATE:April 4,2002 <br />SUBJECT: Septic Review for 4675 Creekwood Trail - CUP <br />A new mound septic system was installed in 1994 for this property. The mound and alternative sites <br />arc sized for a five bedroom home. All water from pool house and main house shall go into the <br />septic system. The e.xisting mound and two alternative sites are located near the south property line. <br />1 recemmend the application be approved in regards to septic concerns for the new pool house. <br />TdephoM (952) 249-MM • Fax (952) <br />www.dMmiojan.us