My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-19-2002 Planning Packet
Orono
>
Planning Commission
>
2002
>
02-19-2002 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 3:34:57 PM
Creation date
2/16/2023 3:30:47 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO I’l-ANMNG COMMISSION <br />Tuesday, February 19, 2002 <br />6:30 o'clock p.m. <br />Caflron indicated it is also tlic Cit\'s intention to subdivide this propertv so the lire station can be <br />located on a separate parcel from the back lot which will ultimately be developed for single family, <br />senior housing or another residential use not yet detennmed Future use of the residential parcel is <br />likely to require some re/oning of the propertv Ciaflron stated the existence of delineated wetlands <br />along the south boundary of the property has resulted in tlic road being placed further north than <br />anticipated, which creates the need for a setback v ariance The setback from the south side of the <br />building to the proposed road-of-way is 40’ instead of the required <br />Gattron indicated some factors which hav e impacted site lav out include the necessarv north/south <br />building orientation to allow for direct fire apparatus exit onto Willow Drive without requiring <br />additional turning movements Gaftroii stated the Fire Department requires direct access onto the mam <br />road without making a second turning maneuver In addition, it is also required that there be driveway <br />aprons required on the cast and west sides ol the building bav s to allow for fire apparatus ingress/egress, <br />necessitating that administrative and training spaces be ItKated on the north or south end of the <br />building Fhird. the road'drivewav .access to the rear of the building must allow for the necessarv wide <br />turning radius of fire apparatus, and four, there needs to be close proximitv to the existmg/future <br />Willow Drive bridge over the railroad and the new I hghwav 12 route Gaflron stated there are also site <br />limitations imposed by width ol the site, as well as bv the location of existing linear wetlands on the site <br />and the need to create a road corridor to provide access to the rear of the propertv for future residential <br />use GalTron noted soil conditions also require extensive soil correction work and limit use of the <br />southerlv portion of the site for building purposes <br />CJaffron slated the wetlands have been delineated as Tvpe 6 and 7. and the proposed proiect will require <br />some filling ot the wetland as well as mitigation Ciaflron indicated the impact on the wetlands has been <br />minimi/ed bv expanding the road corridor and routing tlic road'dnvcway northward over a narrow point <br />of the wetland <br />P.AGE 19
The URL can be used to link to this page
Your browser does not support the video tag.