My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-19-2002 Planning Packet
Orono
>
Planning Commission
>
2002
>
02-19-2002 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 3:34:57 PM
Creation date
2/16/2023 3:30:47 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
c. <br />5 November, 1997 ALEXANDER <br />To the City Planners of Orono: <br />In response to your inquiry about the extent of remodelina <br />After being on the market for over a year, the Olsen ’s <br />purchased the property In June with the intent of immediatelv <br />iTiU°r?o^ house. The house has a sagging roof that <br />IS in need of re-construction. The structure Is of 2x4 v/all <br />constructiori & not up to current energy codes, is in need of <br />window replacement, the porch foundLion is In need of <br />flnuneeding much updating to pass <br />any building inspection for current code compL.ce. <br />r^eas whVra^ hrefbeing <br />re-built. The lower level Is walkout and h« f ’ foundation will be <br />either have 2x6 studrpigaSed <br />the wall. Rebuilding the Sfa rnu^h nl?? ^ <br />v/hat we hope to do. The same ontinne ni hiethod of remodeling and <br />main floor walls that will remain The nain^r?"* applied to the <br />lakeside further than^lenTcodir 1,^ atlakeside further than current codes allow ^ cantilevered at <br />back and re-build it without cantilevers Given that Th ? " <br />wall needs to be re-built to eliminate thfcantilllir^f hf/htn®'"wan needs to be re-built to ehmS fh» . ^''’® "*°'® "'®'"'a'" <br />by contractors to rebuild the floor- fir i=veral rlTsoni' to im®®" ®“99®®'®® <br />eliminate rebuilding of sub-standard a^eis to ^elimTnate rebuiidlnrot ^®®®°®®- >® co'nstr. a <br />level to current ceiling heights, and allow lo deatlBensThil r' <br />now been incorporated into our olan<; The spans. This concept has <br />and a totally new roof truss system installed ' ^ heights will be raised <br />o\trlarn1“e She iSittoilafv^rfaTceT^ <br />please feel free to contact the Olsens or mysetf. ‘'p®®''®"® " " <br />\“:\L 5' r:r AC D£5:c <br />Sincerely,£‘.5TL\%£r^££ <br />V. mzat.\ <br />(612) 4rj.j"r <br />rw (9ii)4-j.i:::
The URL can be used to link to this page
Your browser does not support the video tag.