MINUTES OF THE <br />ORONO PLANNING CO^L\USSION MEETING <br />MONDAY, NOVEMBER 19,2001 <br />6:30 o’clock p.m. <br />(#01-2732 Revis Stephenson, Continued) <br />3. The MCWD shall issue an erosion control permit prior to issuance of a land alteration permit. <br />4. The flushing station located on the property shall be protected by fencing to ensure it will not be <br />damaged during the project. <br />5.All slopes shall be restored with a minimum of fou'' inches of topsoil and seeded or restored w ith <br />some type of erosion control measure, erosion control plan shall be approved by the MCWD and <br />City Engineer. <br />6. The property owner provide some type of financial guarantee that could be used to correct an\ <br />damage to the road caused by the contracfo. ’s activities. <br />7. Fox Ridge Road is a residential street. The contractor shall place siens on Fox Ridce Road alertinu <br />other users of the road w here the w ork .vill be taking place. <br />8. Temporary fencing shall be installed around the construction activity to separate the land alteration <br />activity from the surrounding property. <br />Stephenson stated he is adamant about protecting the wetlands in this area and is agreeable with most <br />of the conditions listed in the Planner’s Report. Stephenson requested clarification of Item «6 relating <br />to the financial guarantee. Stephenson commented he was infomicd bv the contractor that the road <br />should not be damaged, noting the road currently is in poor shape. Stephenson stated the neighbors are <br />supportive of this project since it will eliminate the steep slope, and that his intentions are to pi int <br />native grasses and trees in this area to help restore the area back to its natural state. <br />Mabusth suggested the Applicant discuss the financial guarantee with the contractor. <br />Weinberger stated the work is not expected to start until mid December, and if the ground is frozen bv <br />then, the hauling of the fill will not be a:, big of a concern. ^ <br />Stephenson indicated he has no control over when the fill will be brought in. with the proiect evnectim. <br />to take between five and six days. ^ ‘ ^ <br />Smith inquired whether the impact on the wetland over time would be better or worse with this project. <br />Weinberger stated the City Engineer has indicated that the rate of water runoff will slow dow n bv <br />Hawn recommended a deadline of May 30. 2002 be required for the landscaping and planting. <br />Stephenson stated he docs not have a problem with that requirement. <br />r^emov^'''^^'^ " Applicant would be planting the same number of trees that will be <br />PAGES