Laserfiche WebLink
A <br />ANALYSIS <br />LR-IB Lot Area <br />Required 1 Acre <br />Actual .98 Acres <br />Hardcover Calculations <br />Distance from <br />shoreline <br />Total area in <br />setback <br />Allowed <br />hardcover <br />Existing <br />Hardcover <br />Proposed <br />Hardcover <br />0-75'12,778 s.f.Os.f. <br />(0%) <br />256 s.f <br />(2%) <br />256 s.f <br />(2%) <br />No Change <br />75-250*19.865 s.f.4.966.25 s.f. <br />(25%) <br />5,379 s.f* <br />(27.1%) <br />5.545.69 s.f <br />(27.9%) <br />250-500'10.099 s.f.3,029.7 s.f. <br />(30%) <br />1.588 s.f <br />(15.7%) <br />1.588 s.f <br />(15.7%) <br />No Change <br />Does not include 1462 s.l'. of non-conlbmiing rock and plastic which must be removed. <br />Structural Coverage <br />Total Lot Si/e Total Structural Coverage Percentage <br />42,742 s.f Allowed: 6.411 s.f 15% <br />Existing: 2,789.5 s.f 6.5% <br />Proposed: 2.954.5 s.f 6.9%