Laserfiche WebLink
I <br />TO: <br />FROM: <br />DATE: <br />SUBJECT: <br />Jeanne Mabusth, Zoning Administrator <br />Michael P. Gaffron, On Site Systems Manager <br />October 28, 1980 <br />Review of Stubbs Bay Marina Property <br />On-Site Sewage Treatment Possibilities <br />Attached is my entire file of field notes and sketches on the water <br />table/soil types and drainfield system possibilities for the McCleary <br />property. Since no actual percolation testing has been done, I must <br />recoimnend that a series of at least four percolation tests be done to <br />determine that the percolation rate is in fact acceptable for a mound <br />system although the design of the proposed mound system really is <br />independent of percolation rate and is based on the sewage flow <br />anticipated. As has been previously noted, the black-water (toilet <br />wastes) for the three lots will be segregated from the grey-water <br />and piped to a holding tank for regular pumpout. The grey-water <br />(sinks, dishwasher, shower, clothes washer) is proposed to be disposed <br />of in a mound drainfield system serving all three houses.