My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-01-1979 Planning Packet
Orono
>
Planning Commission
>
1979
>
12-01-1979 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2023 1:41:21 PM
Creation date
2/15/2023 1:40:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tr <lJ <br />5 <br />TO: <br />FROM: <br />DATE: <br />Planning Conunlsslon and Council <br />Jeanne A. Mabusth, Zoning Administrator <br />November 25, 1980 <br />SUBJECT: #589 James K. McCleary, Stubbs Bay Marina (3445 Bayside Road) <br />SUBDIVISION <br />Zoning District LR-IA <br />Work Session - Preliminary Subdivision <br />Area - 2 acres (240* of lakeshore) <br />Review the enclosed rezoning agreemeir* Stubbs Bay Marina. <br />The agreement notes the special stan(?v.;«-^ v^tablished for the unique <br />subdivision. In your review of the suLT^;>;ision, use the following <br />check list to see if those standards are fulfilled. <br />1. <br />2. <br />3. <br />4. <br />Limit of three residential lots. <br />Graywater system contained in special outlet serving all three <br />residences - Outlet B. <br />Lot standards - variances run with property for ten years: <br />lot width - 75' <br />road setback - 20* <br />side setback - 10' <br />minimum distance between house - 20' ??? <br />Outlet A is subdivided as separate parcel of land to be combined <br />with a buildable lot within 2,000 ft. - open space easement to <br />assure placement of one single family dock. <br />Applicant is to submit the required testing for graywater system on <br />Outlet B (see Gaffron memo). Agreement does not appear to waive <br />park fees - what does P.C. recommend? <br />Access for Lot 2 must be addressed, at this point it appears to be <br />landlocked. Access for Lot 1 must be approved by Hennepin County <br />Highway Department and Lot 3's access off East Lake Street must be <br />reviewed by Public Works Department. <br />Public Hearing will be scheduled for January 19, 1981. <br />ii
The URL can be used to link to this page
Your browser does not support the video tag.