Laserfiche WebLink
1 <br />#4 9; <br />November 13, 1980 <br />City Council <br />City of Orono <br />Post Office Box 66 <br />Crystal Bay, Minnesota 55323 <br />Re:Subdivision of Tract E, Registered <br />Land Survey No. 1422; Orono City <br />Control No. 526 <br />2465 Shadywood Road <br />Gentlemen: <br />You will recall that you issued your approval of my <br />application for preliminary subdivision of the above tract on <br />December 12, 1979 and gave me notice that the final plat would <br />have to be filed on or before December 11, 1980. Subsequent <br />to that time, due to the state of the economy and other difficulties, <br />my plans for construction of a new bank building on part of the <br />above tract have been in the process of reconsideration. However, <br />recently it was called to my attention that the due date for the <br />filing of the final plat was drawing near. In response to this <br />reminder, I have arranged to contact Mr. John A. Peterson of <br />C. E. Coulter 6 Associates, Inc., surveyors, who did the original <br />survey work for me in connection with this property. In anticipation <br />that we will most likely go ahead with our plans for the bank <br />building, I have made arrangements with Mr. Peterson to proceed <br />Immediately with the work of preparing the final plat. <br />I now understand that the submission of the final plat not <br />only involves the work that needs to be done by Mr. Peterson, but <br />also requires prior approval of the plat by the Hennepin County <br />Highway Department, the Hennepin County Surveyor's office, and the <br />drafting department of the Registrar of Titles' office (this being <br />torrens' property) before the plat can be submitted to you for <br />approval, and that these prior approvals can take a number of weeks, <br />particularly since we are now approaching the holiday season. <br />I sincerely regret that my lack of information and delay <br />in reactivating these proceedings now make it appear unlikely that <br />a submittal of the final plat could take place before December 12, <br />1980 and that a more realistic date would be January 26, 1981. <br />This is on the basis of an estimate received from Mr. Peterson. <br />,iiS IIIJI <br />_ _ _