My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-07-1979 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1970-1979
>
1979
>
05-07-1979 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2023 1:38:52 PM
Creation date
2/15/2023 1:38:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />i <br />TO: <br />FROM: <br />Planning Comnlsslon and Council <br />Jeanne Mabuath, Asst. Zoning Administrator <br />J1 M <br />it <br />DATE:November 1, 1978 <br />SUBJECT:#435 - Richard Perry, Jr., 440 Willow Drive <br />Variance & Conditional Use Permit <br />Variance - Side Yard Setback (Zoning District RR-IB) <br />Mr. Perry plans to construct a 22' X 24' garage five feet (5') from <br />the southern lot line. The hardship claims arf> narrow lot width <br />(82.5') and extreme grade of slope from middle of lot to the western <br />lot line. <br />Conditional Use Permit - Work Session <br />The applicant proposes filling shaded area on diagram with an <br />estimated 200 wublc yards of clean fill creating a level area for <br />driveway, lawn and plant5.ngs. Hardship claims are extreme slope <br />and hazardous driveway conditions In winter months. Staff recommends <br />the applicant furnish an engineering report noting existing grade <br />and proposed grades after fill, the effects on wetlands to the west <br />and drainage area to be reviewed by the City Engineer. <br />PLANNING COMMISSION MEETING - NOVEMBER 13. 1978 (Variance Request Only) <br />Planning Commission recommended approval of Richard Perry's variance <br />application for a 5* side yard setback. The applicant stated that it <br />would be impossible to make the necessary turn for entering the garage <br />If the building could not be located closer to the side lot line. <br />The hardship claims were the narrow lot width and extreme grade of slope <br />to west of lot. Planning Commission requested Council action on the <br />variance application at the November 14, 1978 meeting because of the <br />Inclement weather. <br />PLANNING COMMISSION MEETING - NOVEMBER 13. 1978 (Conditional Use Permit) <br />Work Session - Mr. Perry reviewed the proposed filling project along <br />the western edge of his property and estimated that he had filled <br />100 cubic yards without a permit. The Building Inspector Issued a <br />stop work order and required 50 cubic yards be removed from the fill <br />area. Planning Commission requests an engineering plan for the project <br />consisting of existing grade, proposed grade, amounts of fill, and <br />City Engineer to study the effects on local flowage district.
The URL can be used to link to this page
Your browser does not support the video tag.