Laserfiche WebLink
1 \rv\450 I <br />y <br />k_ <br />Mff 454 <br />TO: <br />FROM: <br />Planning Coninlsslon <br />Alan P. Olson, Village Planner <br />DATE:Septenber 19, 1978 <br />SUBJECT: Mrs. Wyatt Moe, 1220 Loma Linda <br />Proposed Culvert <br />John Gerhardson and I have been discussing this proposal with <br />Mrs. Moe for some time. In essence, she would like to extend <br />an existing culvert to the lake. This Involves engineering <br />review by the City and the Watershed; hence our request for an <br />engineering design submittal. <br />The proposal would also involve construction and filling within <br />the lakeshore setback area; hence this Informal request for your <br />opinion. Before engineering costs are Invested, Mrs. Moe <br />would like to know whether or not you would consider this <br />application. <br />I stress that staff cannot review or issue any reconmendatlons <br />until engineering data is submitted. This Is conceptual <br />review only. <br />cc: John Gerhardson <br />PLANNING COMMISSION MEETING - SEPTEMBER 25, 1978 <br />Mrs. Moe was present. Dlsccuslon regarding technical/engineering <br />concerns versus policy question of installing storm sewer to the <br />lake. Planning Commission direction Is that water quality and <br />engineering protections are important but that conceptually this <br />correction of an existing problem is reasonable. Should review <br />the retention capability of rear holding area. <br />■ £>■ AM y T A -V