My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-12-1979 Planning Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
1970-1979
>
1979
>
03-12-1979 Planning Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2023 12:39:27 PM
Creation date
2/15/2023 12:39:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
View images
View plain text
r <br />MINUTES Of a planning COMMISSION MEETING HELD ON MARCH 12, 1979 <br />Page 3 <br />I. :u <br />Mfibusth stated a 23% hardcover variance would be <br />required (15% variance previously exists) and a <br />conditional use permit for construction of the wall. <br />Mr. Mitchell also entered into the record two letters <br />from Joseph E. Braun (3020 Casco Point Road) and <br />Warren Ortenblad (2779 Casco Point Road) both <br />approving of the Holzer*s development of their <br />property. <br />ALEXANDER HOLZER <br />2677 Casco Point <br />COND. USE PERMIT <br />#436 (Cont.) <br />Mr. Mitchell again stated that the main reason for the <br />work was the danger of a slide. A drainage plan has <br />been submitted. <br />Mr. Nekich again showed pictures of the two properties. <br />He felt the violations are as follows: <br />1.Garage - Although he again brought up this issue, <br />the Planning Commission refused any discussion <br />as Council declined to reopen the variance case <br />(#417) on November 28, 1978. <br />Grading, Excavating & Filling - *'A great deal of <br />land alteration has been done.*' <br />The violations on the wall are: <br />a) Exceeds hardcover. <br />b) Encroaches 75* lakeshore setback. <br />c) He stated that even if the wall was interpreted <br />to come within the definition of fences in tne <br />code (their contention is that it does not), <br />they can only be 42" high. He feels a lot of <br />the dispute centers around the wall height; it <br />is their contention that the main structure of <br />the wall is 4* high and the pillars are 7*-8* <br />high. <br />"There comes a time when a wall of any nature <br />has become so substantial that it becomes a <br />structure within the meaning of the Code. <br />Therefore it becomes subject to the 10* setback <br />requirement. He feels this wall has reached <br />that point. <br />lJl. <br />' 'V <br />Pfi <br />•C'"*t: <br />If <br />lais-v s. <br />mm <br />j ^ '..SPIT‘i <br />V
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).