My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-03-1980 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1980-1989
>
1980 Planning Packets
>
11-03-1980 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2023 12:09:34 PM
Creation date
2/15/2023 12:08:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RI:GULAR meeting of the ORONO council, SEPTEMBER 25, 197^ Page 6 <br />the”suhrt?!l< Planner, entered into the record ^'’^BDIVISION <br />92S request of H. R. Johnston, 925 Willow Drive South <br />which^^^°'*^ South, dated Septenber 13, 1979, #457 <br />H.R, Johnston <br />Mr. Johnston xs proposing a division of his Dronortv <br />pxeces; one lot around the existing house * <br />and^he remainder to be used for construction or his new home;. <br />f <br />The property is complicated by having only one <br />narrow portion abutting Willow Drive and by <br />intervening completely between Willow Drive and <br />. a land locked parcel of land west of the Johnston <br />property on the end of a peninsula, shown as "X" <br />on the sketches. <br />^he first proposal was for a three lot division <br />including a private driveway outlet. The existing <br />driveway outlet onto Willow Drive was reviewed <br />by the City Engineer with the recommendation <br />that It be moved north for better safety and <br />sight lines. The private road was also to be <br />extended west to serve future development of <br />parcel "X". Plan 2 <br />These concerns caused consideration of a complete <br />plat involving the whole peninsula including <br />parcel "X" and the pieces between the road and <br />this property. Lot 1 would expand westward to an <br />existing fence line. Lot 2 would grow onto <br />parcel "X", as new lot would be created along <br />Willow Drive, See Plan 3. This is the ultimate <br />plan of the developer, if all property could be <br />obtained. <br />$ the additional land acquisition <br />could not be negotiated as quickly as desired. <br />Mr. Johnston wishes to build his new home soon. <br />The ultimate plan is to accomplish the addition, <br />but of course, there is no guarantee of if or <br />when this can occur. <br />As a result, Mr. Johnston now proposes Plan 4, <br />lot lines adjusted to accommodate the <br />ultimate Plan 3. The new house sitp b;^g about <br />ori Lot 2) allowing for ^ <br />th^ existing driveway would be used with an <br />easement to Lot 1. Lot 1 would also be land <br />locked without the driveway outlot. <br />(Continued)
The URL can be used to link to this page
Your browser does not support the video tag.