Laserfiche WebLink
NCE <br />V' <br />ANNER’S <br />«i - A; <br />".^ aflEHST'? •*’ <br />Si! <br />«#-i <br />ITEARNS <br />tadywood <br />iibdivision <br />. PLUHM <br />liters <br />me <br />minutes cf the planning commission meeting of OCTOBER 5, <br />etbick the 75--250 • <br />and subject to the <br />Si";,"""’ <br />2 - Elimin^^o^ Of hardcover.iminated potential building lot in the 0-1000* <br />•j area to Lake Minnetonka. <br />Traffic would be cut down off Walters Port Lane. <br />and subject to the fo^..owing conditions: <br />^ fro« footings within the 0-75* setbackarea to be removed and returned to natural state <br />prop^tv'^irors hardship that the subject <br />shor*»iino a pie shape with an extensive curved <br />lhrbij?ling"enveJlpef'°'’° <br />ioetten seconded. Vote: Ayes (4), Nays (0). <br />was an**addfii^n®®?''^ IJ®^® present. Goetten asked if there <br />Dictur.^^^ ^ hoMse. looking at the oldir <br />aftr?he"L:?" "‘’®" ^U® °«ered^no"h^?p''o^:dvLr"as to the best way to handle this. Applicant stated <br />he knew that to excavate you needed a oe^it het ^was not involved in this project P®™^t but excavating <br />Seviouc ^»ifte^ It inspection for the <br />to the erosion of the Lnk"‘and^Ipee?er®sLte “?Lrwaf h°" <br />next project. Goetten stated at that timflL advised <br />him a permit was required and he agreed <br />p!PH <br />Hi.- . i: •••? <br />.*:■ ■■ .wj <br />Hi ••=;. <br />^=-> ;-v <br />••1 <br />•• • \ ^,r.- ■: ■: <br />MfTil <br />investigate the best approach to the situation