My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-15-1981 Planning Packet
Orono
>
Planning Commission
>
1981
>
06-15-1981 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2023 11:13:02 AM
Creation date
2/15/2023 11:11:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TO:Planning Commission <br />FROM;Jeanne A* Mabusth <br />DATE;June 11, 1981 <br />SUBJECT;#629 Allan C. Larson, <br />Conditional Use Permit <br />Zoning District - LR-lC <br />Application - conditional use permit to construct retaining <br />wall and replace wooden stair structure to lake <br />shore dock <br />The applicant proposes construction of a 40* lono S^s'high <br />retaining wall to prevent further erosion of their lakeshore <br />bank. It would appear that the original house construction <br />so close to the bank created the severe instability. Rip <br />rap is not feasible. The retaining wall is the only method <br />available to control the extensive erosion that is contin <br />uously weakening the stairs structure to the lake and even <br />tually may cause structural damage to the house. <br />The proposed stairs structure is far too ambitious and must <br />be trimmed down. I suggest that the 6* maximum width stan <br />dard for docks be allowed (spaced board construction). The <br />5' X 12' landing must be trimmed down to 5* x 6'. The new <br />central location of the stairs is no problem. Any additional <br />structure or decking on the surface of the shoreline must be <br />replaced with eitner crushed rock or other permeable material. <br />The replacement of the stairs, the landing 5’ x 6' in con <br />sideration of the safety factor and the retaining wall are <br />the only structure that can be considered within the pro <br />tective lakeshore setback area. <br />The retaining wall design will be reviewed by the City Engineer. <br />I may have imput from our engineer at our meeting.
The URL can be used to link to this page
Your browser does not support the video tag.