Laserfiche WebLink
#671 Schlee Builders <br />Page 3 <br />Recap Memo <br />5. <br />6. <br />Planning Commission should make recommendations to the <br />Council concerning conditions of approval for: <br />A. Maximum individual lot hardcover (35% on <br />each lot results in 28% overall hardcover <br />for the project) <br />B. Offstreet parking - whether 1 or 2 stalls <br />should be enclosed. <br />C. Accessory buildings - should any be allowed <br />and if so, how many and of what size? <br />(Recommended maximum 1/lot, maximum 600 sf; if any) <br />Any preliminary approval should be conditioned upon <br />compliance with: <br />A. Sewers to flow north per City Engineer's <br />recommendation. <br />B. Water main extension per City Engineer's <br />plan approval. <br />C. Storm drainage system per City Engineer and <br />M.C.W.D. plan approval. <br />D. Street construction per City Engineer's plan <br />approval. <br />E. Tot lot park dedication subject to Park <br />Commission recommendations, with total park <br />dedication per Ordinance #220, Section 39.170 <br />et. seq., and the current fee schedule. <br />F. Payment of all required development review <br />and improvement inspection fees, park dedication <br />fees, and improvement costs, connection charges <br />or assessment waivers, all to be negotiated <br />with the Council once final density and development <br />type is decided. <br />7. Separate Planning Commission motions should be made on: <br />A. Single detached vs attached unit variance (approval <br />or denial) <br />B. PRD Conditional Use Permit (approval or denial) <br />C. Preliminary Plat (conditional approval or denial).