My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-19-1982 Planning Packet
Orono
>
Planning Commission
>
1982
>
04-19-1982 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2023 11:01:09 AM
Creation date
2/15/2023 10:59:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EX!i!"iT <br />TO:Jeanne A. Mabusth, Zoning Administrator <br />FROM:Michael P. Gaffron, Septic System Inspector <br />DATE:April 14, 1982 10:30 PM <br />SUBJECT: Duff On-Site Proposal <br />0-4"+ Loamy Topsoil <br />4"-10"+ Clay Loam Fill (frozen/melting). Mottled, Saturated <br />10"-12"+ Sandy Loam or Sand, Dark Gray, Saturated <br />12"-15"+ Clayey Sand, Mottled, Saturaged <br />15"-30"+ Terminated Medium Sand, Large Gray/Red Mottled <br />Pattern, Saturated <br />Site is at elevation 932'+, has standing water, very flat, <br />obviously was filled and planted with evergreens some years <br />ago. Mottling indicates seasonal saturation very near surface, <br />drainage away from site is very poor. This is not an acceptable <br />site for either a standard drainfield or a mound, due to: <br />' <br />1) Seasonal saturation essentially at the surface <br />2) Lack of appreciable topsoil <br />3) Clay layer (fill) which would effectively limit infiltration; <br />and <br />4) Lack of drainage away from site <br />J
The URL can be used to link to this page
Your browser does not support the video tag.