My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-21-1982 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1980-1989
>
1982 Planning Packets
>
06-21-1982 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2023 10:57:56 AM
Creation date
2/15/2023 10:56:22 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
exhibit <br />Jeanne A. Mabusth, Zoning Administrator <br />Michael P. Gaffron, Septic System Insicector <br />June 14, 1982 _ <br />W- <br />SUBJBCT: «654 Dlcon, 155 Willow Drive South - Additional On-Site <br />Testing <br />I have reviewed the submitted soil and site ev«l*.*ation for the <br />two lots on the north side of the road in Phase 1. Testing <br />indicates average perc rates varying from 1 to 48 mpi, with <br />high water tables (saturated zones) in all but the most northeasterly <br />site. Mound systmns are applicable for all these sites, although <br />the northern site for Lot 1, Block 1, could support a shallow <br />trench system. <br />O : <br />X note that Lots 2, 3 emd 4 in Block 2, have been realigned. <br />By superimposing the previous testing over the new lot lines, it <br />is apparent that 2 of the 6 perc tests originally done on Lot 4 <br />are now on Lot 3. Technically, additional testing should be done <br />within the boundaries of the revised Lot 4. However, since the <br />soils appear to be fairly consistent throughout the division, and <br />since mounds will be used on all the lots, this minor additional <br />testing is not critical and may be waived until a house is proposed <br />for the site. <br />vm-. <br />11^' <br />I will reiterate that mounds should be placed on the most level <br />sites within the tested areas; and that prior to road <br />all drainfield sites should be staked off to eliminate <br />or disturbance. <br />construction <br />I <br />■ • <br />Hi’ <br />’-4 <br />' <br />i*"'. <br />mtir <br />^ • \ • <br />MM <br />r; <br />at <br />■■ '»■'
The URL can be used to link to this page
Your browser does not support the video tag.