My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-15-1982 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1980-1989
>
1982 Planning Packets
>
03-15-1982 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2023 10:56:10 AM
Creation date
2/15/2023 10:55:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO:Planning Commission <br />FROM:Thomas J. Jacobs, Building Official <br />DATE:March 11, 1982 <br />SUBJECT: #672 New Life Bible Church, 830 Old Crystal Bay Road <br />Conditional Use Permit <br />Zoning District - RR-IB <br />Area - 8.84 acres <br />Application - Conditional Use Permit for a New Church <br />List of Exhibits <br />Exhibit A <br />Exhibit B <br />Exhibit C <br />Exhibit D <br />Exhibit E <br />Exhibit F <br />Walter R. Benson memo <br />Alan P. Olson, City Planner memo <br />Access plan <br />Parking plan <br />Site plan <br />Floor plan <br />Building and Zoning staff has received a memo from Dick Benson, <br />City Adonistrator, on the sewer and water issue in Long Lake <br />(Exhibit A). <br />At this time the City of Orono has an agreement with the City <br />of Long Lake not to encourage further development which would <br />require municiple sewer and water until: <br />1 - The Orono-Long Lake-Medina sewer by-pass is completed <br />(due to be completed summer of 1982). <br />2 - The new expansion to the water system is completed. <br />(See Exhibit B) <br />They still have the option of on-site sewer and water, but they <br />also must take into consideration that a fire sprinkler system <br />must be installed in this type of occupancy. <br />At this time a decision must be made by the applicant on how <br />he wants to handle the application. The options are as follows: <br />1 - Wait until the sewer by-pass and the proposed expansion <br />of the Long Lake water system in complete. (Approximately 1 year) <br />2 - Install on-site sewage and water system, and provide <br />water storage tank for sprinkler system. <br />3 - Withdraw application. <br />I have reviewed the plans that were submitted to me, but haven*t <br />asked for further information until we get an answer to the above <br />question. <br />At the last Planning Commission meeting of January 18, 1982, <br />the following items were requested: <br />aasm tiMniiilii [ iiiiiniWitiUlltiii'lS—ir^i
The URL can be used to link to this page
Your browser does not support the video tag.