Laserfiche WebLink
- <br />CSPP (0)\JUNE, 1981 <br />REVISED NOVEMBER, 1981 ■r/ <br />r* <br />Ali <br />MAP NO. 6 INDICATES THE LOCATION OP THE METROPOLITAN URBAN SERVICE AREA <br />(MUSA) AND THE METROPOLITAN SENER SERVICE REGION (MSSR) WITHIN ORONO. <br />Ovtaraiaing and dafining tha axact location of tha MUSA and NS8R line <br />in Orono has baan a basic objactiva of Orono's Conaittnity Planning <br />affosts. Tha location shown on Map No. 6 is consistant with tha axisting <br />boundary batwaan urban and rural parts of Orono. Sufficiant urban land <br />is availabla to accoamodata all projactad urban growth as indicatad in <br />tha tabla on paga 6-39. For this raason, Orono is cartain that this <br />location of tha joint NU8T/MSSR lina can ba paraanantly maintained <br />through inplanentation of tha policias and objactivas of this CMP. <br />Tharafora, tha City of Orono and Orono citisans ara planning and making <br />long tarsi invastaants basad on tha ooncapt that this existing urban/ <br />rural land use pattern will ba paraanant. <br />w: <br />/.It <br />Zn thair raviaw of this CMP and intarim CSPP, tha MWCC indicatad that <br />t:hay agraa with Orono*s aappad location of tha MUSA lina, and the <br />Metropolitan Council accepted Orono*s concaptwhan they approved this <br />CMP without any required changes. It is Orono*s plan, and orono*s <br />racoaaandation, that tha Metropolitan Council foraally aaand tha <br />Metropolitan Devalopaant Guide so that thair broad-brush maps will <br />agraa in detail with tha MUSA/M88R location shown on Orono*s Nap 6, <br />and on all other Naps in this CSPP Chapter <br />SENER FACILITIES PLANNING FOR URBAN ORONO IS BASED UPON INVENTORY AND <br />ANALYSIS OF THE THIRTEEN AREAS CONTRIBUTING TO THE EXISTING MUNICIPAL <br />SYSTEM. <br />Tha inventory of tha axisting municipal sewer system capacity included <br />analysis of expected urban development and increased sewage flows <br />shown as reserve capacity in tha tables on Page 6-39 and in tha CSPP <br />Appendix. For purposes of sawar facilities planning, this expected <br />growth la divided into four categories. <br />SEWER FACILITIES PLANNING FOR RURAL ORONO IS THE FUNCTION OP THE ON«SITE <br />MANAGEMENT PROGRAM. <br />The Metropolitan Council’s Water Quality Management Policy 12 (Pg H12/79) <br />states that ”THB PRBFBRRBO NBTHOD OF WASTEWATER DISPOSAL FOR MEW RURAL <br />DBVBLOPMBMT IS TBB INDIVIDUAL OM-SZTB SYSTEM". Consistent with this <br />philosophy, and with Orono*s commitment to maintenance of permanent rural <br />areas in tha community, Orono has pioneered in tha establishment of a <br />full-sarvioa On-Sita Management program designed to assure the continued <br />performance of on-sita systems. <br />I <br />CMP 6-40