My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-17-1982 Planning Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
1980-1989
>
1982
>
05-17-1982 Planning Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2023 10:41:52 AM
Creation date
2/15/2023 10:41:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE PLANNING COMMISSION MEETING OF MAY 17, 1982 Page 3 <br />busth stated that any expansion would require a <br />conditional use permit application. <br />CHURCH (CONT) <br />Goetten stated that she felt that 54 stalls was more than <br />enough parking area so why require paving? <br />Mabusth stated that the gravel parking area also includes <br />the required loading berth. <br />Callahan stated that this proposal might excel and <br />grow very much but on the other hand it might go the <br />other way and then the City would have a non-conformin <br />building with no paving. If they are going to grant <br />a conditional use to them now they should conform to <br />all the codes. <br />v ' v:: <br />Rovegno asked why they were assessed 1 sewer Uiilt? <br />Mabusth stated that the entire 50 acre parcel was asse <br />1 sewer unit and that the church was to receive that <br />unit. <br />Rovegno asked if it did need another sewer unit would <br />they have the pipe capacity to do this? Also with all <br />the expansion they have planned for the future, how <br />^yiy sewer units will they get to?V' <br />Mabusth stated that if Council approves an additional <br />unit for the church it would be taking away units from <br />school. <br />• ■ <br />Rovegno asked if Michael Gaffron had look at the <br />property for septic purposes? <br />Mabusth stated that because of the area of the lot, Ga <br />was not asked to do an in depth review. <br />Goetten asked when the Long Lake and Medina hookup <br />would be completed? <br />Mabusth stated sometime this summer and that that <br />line runs right by the church.M y'\ <br />. t:‘ . v: ' • <br />Rovegno moved to approve the conditional use permit <br />for the New Life Bible Church to permit construction o <br />a 136' X 72' church building subject to the following <br />conditions; <br />V' <br />X. *. V. <br />i- <br />1 - <br />0 <br />All future building additions or expansion of <br />accessory improvements will require the filing <br />of a new conditional use permit. <br />1
The URL can be used to link to this page
Your browser does not support the video tag.