My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-07-1977 Planning Packet
Orono
>
Planning Commission
>
1977
>
02-07-1977 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2024 3:07:33 PM
Creation date
2/15/2023 8:35:59 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, -vw- <br />• • V <br />wm i - <br />f’lK'sl. <br />■’^Kf'r ..'. -.r. • , • <br />ts <br />^« <br />ID: <br />FROM: <br />DATE: <br />SUBJl-CT: <br />Henr>' F. Muhich, !!oning Administrator <br />A. P. Olson, Asst, Zoning Administrator <br />February 3, 1977 <br />Marina License - Stubbs Hay Marina, James McCleary <br />3445 Havsidc Road <br />1977 license application received on February 2, 1977 <br />Annual Fee <br />72 Slips <br />120 Slides <br />i 75.00 <br />$208.00 <br />$120.00 <br />Total Fee $303,00 Due <br />Facilities:One main dock, 180 ft. long with 3 amis (180 ft. total width) plus <br />smaller docks along shoreline. Mo pontoon dock shown for 1077. <br />Fuel Service; inside storage and l)oat repair. <br />Qianges frcwi 1976: Boat and Pontoon rental discontinued. Aildition o^‘ 5 slips and <br />84 land storage slides. Previous restaurant and niarim imilding <br />destroved bv fire 11-15-76. Council action 1-24-77 denieil re^iuost <br />to reopen non-conforming restaurant. Application shows proposed <br />plan for new 80 ft. x 200 ft. boat storage and repair building and <br />stipulates removal of all existing stnictures. <br />Proposed hours: 6 a.m. to 12 p.m. daily. <br />1976 landscaping completed: new trees and hedges. <br />Prior landscaping not completed; none. <br />Proposed 1977 landscaping:minor readjustment of green areas and landscaping around <br />proposed new building; reisoval of existing main building <br />and replacement with oiitsulc storage area. <br />Percentage of completion - 4 year plan: lOO’o. <br />Suggested area for attention: detailed access, parking, landscaping and appearance <br />changes caused by new building construction (to be <br />considered \dien building plans are submittcfl for <br />review). <br />t . <br />m <br />Vii <br />, -AS . <br />.-IT-i <br />m
The URL can be used to link to this page
Your browser does not support the video tag.