Laserfiche WebLink
DEC 1 0 2001 <br />C^ITU^onul^ <br />REQUEST FOR COUNCIL ACTION <br />DATE: December 10.2001 <br />ITEM NO.: ^ <br />Dcpirtneal Approval: <br />Naaic Gregory A. Gappa <br />Titk Director of Public Services <br />Adminiitnitor Reviewed:Agenda Section: <br />Public Ser\ ices's Directors Report <br />lleni Description: Lift Station Pump Control Panel Replacements <br />The 2001 Sewer Capital Improvement Budget included S30.000 each for three lift stations to replace <br />the pumps and conut>l panels. These three stations were constructed in 1971 as part of the Saga <br />Hill/Torest Lake Area S^itary Sewer Project. Approval for the pump replacements has already been <br />obtained. The total cost for the pump replacements is $40,000. so there is $50,000 left in the budget <br />for the control panel replacements <br />We have obtained quotations for the installation of new control panels in these lift stations. The <br />lowest quote was from Electric Pump of Minneapolis. These new panels will be large enough for <br />the future installation of SC ADA equipment. <br />Lift Station #16 $11,710 <br />Lift Station # 17 $11,710 <br />Lift Station #19 $11,710 <br />Total Cost $35,130 <br />COUNCIL ACTION REQUESTED: <br />Motion to occept quotation from Electric Pump. Minneapolis MN for lift station control panel <br />replacements in the amount of $35,130