My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-26-2001 Council Packet
Orono
>
City Council
>
2001
>
11-26-2001 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 3:26:29 PM
Creation date
2/9/2023 3:23:55 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Application Dale: 8/20/01 <br />Deadline: 10/19/01 <br />TO: Chair 1 lavsn and Orono Planning Commission Members <br />Ron Moorse, City Administrator <br />FROM: Paul Weinberger. Zoning Administrator/Planner <br />DATE: September 5.2001 <br />SUBJECT: #01.2711 Western Steel Erection, Inc. <br />2687 West Wayzau Boulevard <br />Outdoor Storage Conditional Use Permit <br />Zoning District: <br />List ofExhibiu <br />I, Industrial <br />A Application <br />B Letter of Request <br />C Plat Map <br />D Survey <br />E Site Plan <br />F Section 10.50 * I, Industrial District Standards <br />O Property Owners Notification List <br />Review of Request Western Steel Erection, Inc. has leased the 16,200 s.f. building located at 2687 <br />Wayzata Boulevard. Western Steel has approached the City of Orono because there property in Long <br />Lake is being acquired by the City of Long Lake for a new j ublic work facility. Western Steel <br />constructs steel framing beams used for construction projects. They are a permitted use in the <br />Industrial District. Please review Exhibit F a list of permitted and conditional uses in the district. <br />Western Steel is requesting a conditional use permit to permit permanent “outside storage ” to permit <br />parking of 30 company trucks, 6 cranes, welding equipment and construction of a 1,000 gallon above <br />ground fuel tank. The company employees approximately 80 people. The parking areas would be <br />located along the east and northeast sides of the existing building. <br />Zoniag Requirements <br />Building Setbacks <br />Front 75 feet <br />Side A distance equal to one and one-half times the building height = approx. 35 feet <br />Rear 30 feet <br />•01*271 1 Wcwni SMd Erection, he <br />2617 Wajnu Boitktatd <br />9H1/01 <br />f^iora
The URL can be used to link to this page
Your browser does not support the video tag.