Laserfiche WebLink
m <br />Carman Bay Stubbs Bay <br />PondCB-Q3 (1)19.000 Pond SB-Q16 (1)15,000 <br />Roadside techniques along <br />Blaine Ave in subdistricts <br />CB-0 and CB-2 (II) <br />9,000 Ravine stabilization in <br />subdistrict LC-23 (1)108.000 <br />Pond CB-Q9 (I)20,000 Pond LC-Q1000 (1)33,000 <br />Forest Lake Pond SB-Q9.1 (II)110,000 <br />Ravine stabilization in <br />subdistrict FL-19(I)63.000 Ravine stabilization in <br />subdistrict SB-9 (II)135,000 <br />PondFL-Q15(l)18,000 Pond SB -Q5 (II)13,000 <br />Roadside techniques in <br />subdistrict FL-0 (II)10,000 Ravine stabilization in <br />subdistrict SB-5 (II)68,000 <br />Ravine stabilization in <br />subdistrict FL-20 (1)108.000 PondSB-Q11 (II)23.000 <br />Maxwell Bay <br />Roadside techniques along <br />Bayside Road (II)30,000 <br />PondMB-Q7 (II)47,000 Roadside techniques along <br />Tonkawa Road (II)15,000 <br />North Arm mmi Tanager Lake <br />Ravine stabilization in <br />subdistrict NA-0, extending <br />SW from node 590 (1) <br />72.000 Study flow at top of sub- <br />district TL-11/node 901 (I)19.000* <br />PondNA-Q9 (1)47,000 Roadside techniques along <br />Browns Road S (II)27,000 <br />Ravine stabilization at north <br />end of subdistrict NA-0, near <br />pondNA-QSOOO (II) <br />72,000 Roadside techniques aiong <br />Shoreline Drive (II)27,000 <br />Ravine stabiPization at north <br />end of subdistrict NA-0 (II)72,000 TOTAL 1,168,000 <br />“--------- <br />for nv(M •tabOtuttoA. coati aro tstlmataa oo/y baud on $90 par Inaar IboT <br />* Study eoita of $4000 par yaar lor four yaan. plua Inlial purcfiata of aampOns aquipmoni $3,000 <br />• par Wtaar loot coats rapraawrt an awarapa ovar *a langOi of tha projact ala