My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-13-2001 Council Packet
Orono
>
City Council
>
2001
>
11-13-2001 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 3:26:21 PM
Creation date
2/9/2023 3:23:29 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF TIIK <br />ORONO cm' COUNCIL MEETING <br />Moaday, October 22,2001 <br />7:00 o'clock p.m. <br /><02640/41 Dunbar Development, Continued) <br />Flint commented lliis t>pe of conversation is non-productive, and recommended the Council set on this <br />matter. <br />Flint moved, ^'hite seconded, to approve turdcover in the amount of 1,675 square feet within <br />75 feet of the Ordinary High Water Level of tbe lake; to approve hardcover in the amount <br />of 2,885 square fret in the 75-250’ setback area; to approve the setback variance to allow the <br />house to be located approximately 47 feet from the lake at lu closest point; and to approve a <br />variance to lot area, inbject to Staff review and approval of the final house design; and further <br />subject to extension of City sewer to the property located at 1340 Baldur Park Road. <br />Pu/ok inquired what would happen if Franklin decides not to give him an easement at no cost. <br />Flint stated then the Applicant would need to revise his plan to meet the septic available. <br />Sansevere stated that is one of the reasons why he would piefer this application be sent back to the <br />Plaiuiing Commission. Sansevere stated he would prefer all these issues be resolved prior to this <br />application coming before the Council <br />Puzak stated h's application has been dcla>ed for a number of years because of Uie septic issue, <br />and that he is attempting to proceed fonsard by obtaining the septic testing. Pu/ak stated the Planning <br />Commission did recommend approval of his application subject to a connection to City sewer or that a <br />suitable septic site be shown. Puzak stated he has demonstrated that a suitable septic site is available, <br />but that his house plan would need to he modified if he utilizes private septic. <br />Franklii. commented that it is his belief the Planning Commission was led to believe that he would not <br />grant Puzak an easement for the sewer, which is not the case. <br />Puzak stated if Franklin does not grant an easement w ithin the nc.xt two weeks, he would like to <br />continue with his proposal to redesign his house based on the variances granted tonight. <br />Sansevere staled he would oe required to come back before the Council if he decides not to hook up to <br />City sewer. <br />Flint noted Franklin has indicated a couple of times on the record that he is w illing to grant an easement <br />at no cost to Pu/ak. <br />Puzak commentc ' that Franklin has indicated he would like to construct townhomes on his property. <br />Franklin stated he heS spoken with Weinberger on what his property could accommodate. Franklin <br />stated he has been informed he can construct two houses on these lots, which would require two sewer <br />connections. Franklin staled the sewer would be divided three wayx. <br />Tom Barrett. City Attorney, recommended if the motion is approved, that City Staff provide findings to <br />support the conclusion, w ith the Council voting on the findings at the next City Council meeting. <br />PAGE 21
The URL can be used to link to this page
Your browser does not support the video tag.