My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-22-2001 Council Packet
Orono
>
City Council
>
2001
>
10-22-2001 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 3:26:11 PM
Creation date
2/9/2023 3:21:32 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
523
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Sanitary sewer and water lines and facilities (hereinafter called "sewer and water <br />improvements") and storm sewer lines and facilities (hereinafter called "stormwater <br />improvements") per the approved Utility Plan attached hereto as Eihibil C. <br />Relocation of the existing gravity sew er line extending from Brown Road North to <br />the lift station near the southeast comer of I ot 2, as required by the City pursuant to <br />the letter attached hereto as Exhibit I and the agreement attached hereto as Exhibit <br />J. shall be the responsibility of Sidney B. Rcbers, seller of Outlot F. Sugar Woods. <br />Underground natural gas. electric, cable and telephone serx ice to be arranged by <br />Developer with the utility companies involved (hereinafter called the "other utility <br />improvements"); <br />(d) Landscaping and site revegetation improvements per the approved Landscaping <br />Plan attached hereto as Exhibit E (hereinafter called "landscaping improvements"). <br />Trallic control signage subject to approval by the City Engineer and Public Sen ices <br />Director. <br />The above Phase 1 improxements arc further detailed witliin the Site Improvenicnts Cost <br />Estimate attached hereto as Exhibit II: <br />Construction Plans : Detailed plans and specifications for the complete installation of the <br />Improvements shall be submitted by the Developer for the approval of the City of Orono <br />prior to issuance of applicable City permits. The Plans and Specifications shall conform to <br />all current City standards for all applicable work and shall comply with the terms of this PUD <br />Agreement <br />11. Construction of Improvements; <br />(a) Commencement Date - The construction of Improvements shall begin no later than <br />December 31.2001. <br />(b) Completion fhitc - All Improvements shall be completed no later than December 3 1 . <br />2002. <br />Page 6 of 17
The URL can be used to link to this page
Your browser does not support the video tag.