Laserfiche WebLink
A single direct access to I lighwav 1 2 shall be developed at a location approximately 500 feel <br />west of the intersection ofUrown Road and 1 lighvvay 1 2. ‘Ihis direct access slmll be restricted <br />to westbound right-in/right-out turning movements, and shall be subject to MnDOT design <br />approval. <br />A third access point located near the northwest comer of Lot I shall provide for future access <br />to a future public road which ma> K* constructed within Outlot D, Sugar \ViH>ds. At such <br />time that a public road is constructed within said Uullot D, the City sltall have the rigltt to <br />connect such public road to the internal road system within Lots 1 and 2 for the purpose of <br />providing additional ingress'egress options for Lots I and 2 as well as provide ingress egress <br />options for properties west of Lot I. <br />The Developer shall grattt to the City public n>ad. drainage and utilities easements over the <br />private rood corridor including all surface parking ureas, in order tlut future public use of the <br />roadways is ensured in the event that a future connection to the west is established. <br />Developer shall grant cross easements between Lots 1 and 2 to ensure full u.se of the internal <br />private rood system until such time that the City exercises its easement rights to convert all <br />or a portion of the internal road system to a public road status. It is specifically agreed that <br />the City is not obligated to maintain the private intental road system until such time that the <br />City chooses to convert all or a portion of the internal road system to u public road, and <br />coastruction of an access connection to a public auid in Outlot D, Sugar Woods shall not <br />automatically temiinate the private road status of the internal road sv stem. <br />5. <br />Off-site access improvements that arc the responsibility of the developer shall include <br />establishment of the right-in'right-out access curbing for the southerly access. Any turn-lane <br />or acceleration lane improv ements or re-striping that may be required by MnDOT for that <br />access shall be the responsibility of the City. Other olV-site access improvements that will be <br />the responsibility of the City shall include establishment of the semaphore and related <br />improvements at the intersection of Brown Road North and Highway 12. <br />Building Desien and Constmetion. The ofTice buildings on Lot I shall be constructed <br />according to the plans on file with the Cin* which shall be subject to rev icw and approv al bv <br />the City Council prior to issmin^y pf h‘"ldinp. permits. On Lot 1. the preliminary plans <br />indicate a two story office building with parking on the basement level, llte second story <br />is set back from the first story at the north end of the building to reduce impacts to the <br />residential neighborhood to the north. Windows arc also minimized on the north end of the <br />office building to reduce impacts on neighboring properties. The roof is a standard shingle <br />Page 3 of 14