Laserfiche WebLink
f/O, ov <br />* t <br />(?- <br />GITYorOllONO <br />MMldpHiOfflOM <br />SirHtaMtttfe <br />2750 Why PvkMy <br />Onm. MN 55556 <br />P.O. la 66 <br />Ciytt*l Biy, m 553234XX6 <br />TO: Wendy Bottenberg <br />FROM: Man Bolterman, On-Sile Systems Manager <br />DATE: June 14. 2001 <br />SUBJECT: Septic Review for Kirt Woodhouse Lot <br />The proposed I lot subdivision requires the use of on-site sewage treatment systems. Soil borings <br />and percolation tests were performed by Swedlund Septic Services to identify primary and alternate <br />drainfield sites for the new lot The other two lots have existing septic systems on them already. The <br />new lot has a primary and alternate site for an in-ground septic system The information provided <br />indicates that both drainfield sites meet all Orono and Minnesota 7080 standards for location No <br />design information was provided for the new septic sites <br />Based on the above information, stafi'recommends approval of the subdivision in regards to septic <br />location. <br />1UfplMM(iS2)24M6M • rn(932)MM6M <br />www.ctaniwaa