Laserfiche WebLink
8. <br />control measures to be used during consmiction has been approved per the plans <br />submitted by Loucks Associates dated___________. <br />The Minnehaha Creek Watershed District and MnDOT has approved the <br />storm\%ater plans and all appropriate permits have been issued to the applicant. <br />Final engineering details and design are approved for the retaining wall per the <br />plans completed by Loucks Associates dated___________.. <br />Final sanitary sewer and watermain plans have been approved by the Public <br />Works Department and City Engineer, per the plans completed by Loucks <br />Associates dated___________. <br />The sidewalk/trail connections shall be provided to the Brown Road trail along <br />the east side of the property, from the property to the sidewalk along Highway <br />12, and between each of the proposed buildings. All trails shall be permanently <br />owned and maintained by applicanl'property owner to provide pedestrian access <br />through the site. Applicant has granted trail easements to permit public use of <br />the trails. <br />The parking lots shall be paved with concrete curb and gutter, driving lanes <br />within parking lot shall have a 9-ton pavement section for trucks. A <br />geotechnical evaluation of the soil shall be done in conjunction with the <br />pavement design has been approved by the City Engineer. <br />Applicants' architect has submited final development plans to the Metro Council <br />Environmental Services to determine the exact number of SAC units to be <br />charged at the time of the issuance of a building permit. Metro Council <br />Environmental Services has determined the total number of SAC units to be <br />charged is_________. <br />The City has determined the additional Sewer and Water Unit Adjustment <br />Charges and system upgrade connection charges to be_______units, of which <br />______will be defirred for the period established within the Developers <br />Agreement and conditions of the Land Lease from the City of Orono to the <br />building owTiers. <br />Page 5 of 10