My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-08-2001 Council Packet
Orono
>
City Council
>
2001
>
10-08-2001 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 3:23:01 PM
Creation date
2/9/2023 3:21:16 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
b <br />City of Orono <br />2750 KcUcy Parkway <br />P.O. Box 66 <br />Orono, MN 55323 <br />Phone: (952) 294-4600 Fax: (952) 249-4616 <br />MEMORANDUM <br />DATE:October 1,2001 <br />TO:Mike GafTron <br />FROM: Paul Weinberger <br />SUBJECT: Dunber PreliminarN’ Plat Resolution and Outstanding Issues Checklist <br />Attached is the draft Preliminary Plat Resolution for the Dunbar Project. I have left some findings <br />in the document that are the same findings u-e had made in the General Concept Plan approval. In <br />some cases they arc verbatim to what the General Concept Plan read. Do you feel it is necessary to <br />repeat? I have also written notes in the margins of things we may want to add/change. <br />This is a list of outstanding issues o*- additional info we may need before the final approval: <br />Payment of Final Plat fees. <br />Is the senior building for 55 + or 62 ■♦■? <br />Final lighting plan, including plans for street lighting to match the Long Lake plan. <br />Final traffic signage, Greg (and possible the P.D.) may want to comment before we ask for <br />final plans. <br />Final monument sign plans. <br />MnDot approval of the Stormwater Management Plans <br />MCWD approval of SWMP. <br />Landscaping Plan shall be reviewed by DSU (Wally Case will review) <br />All utility, grading, stomiwater management, etc. shall be approved by Public Works and <br />Engineering (Kellogg is review ing) Estimate shall be given to Dunbar for letter of credit. <br />Fire Marshal and Steve Persion arc meeting later this wwk to review and approve final plans <br />Met Council final determination is required for determining SAC units <br />T- 1*- T*-
The URL can be used to link to this page
Your browser does not support the video tag.