Laserfiche WebLink
A single direct access to Highway 12 shall be developed at a location approximately 500 feet <br />w'cst of the intersection of Brown Rood and I lighwny 1 2. This direct access shall be restricted <br />to westbound right-in/right-out turning movements, and shall be subject to MnDOT design <br />approval. <br />A third acces.s point located near the northwest comer of l.ot I shall provide for future access <br />to a future public nxul which may be constructed within Outlet O. Sugar Wotxls. At such <br />time that a public road is constructed within said Outlot D, the City shall have the right to <br />cimnect such public road to the internal road system within Lots I and 2 for the purpose of <br />providingadditior.il ingress/egress options for Lots I and 2 as well as provide ingress'egress <br />options for properties west of Lot I. <br />Tlie Developer shall grant to the City public road, drainage and utilities easements over the <br />private road corridor including all surface parking arcas, in order that future public use of the <br />roadways is ensured in the event that a future connection to the west is established. <br />Developer sliall grant cross easements between I.ots I and 2 to ensure full use of the internal <br />private road s>stem until such time that the City exerci.ses its easement rights to consert all <br />or a portion of tlie internal road system to a public road status. It is specifically agreed that <br />the City is not obligated to maintain the private internal road system until such time that the <br />City chooses to convert all or a portion of the internal road system to a public road, and <br />construction of an access connection to a public road in Outlot D. Sugar Woods shall not <br />automatically terminate the private road status of the internal road sy stem. <br />Off-site access improvements that are the msponsibility of the developer shall include <br />establishment of the right-in'right-out access curbing for the southerly access. Any tum-lane <br />or acceleration lane improvements or re-striping that may be a*quired by MnDOT for that <br />access shall be the responsibility of the City. Other otT-site access improvements tliat w ill be <br />the responsibility of the City shall include establishment of the semaphore and related <br />impro\ ements at the intersection of Brown Road North and Highway 12. <br />Building Desien and Constmetion. The office buildings on Lot 1 shall be constructed <br />according to the plans on file with the City. On Lot I. the plans indicate a two story ollice <br />building with parking on the basement level. The second story is set back from the first story <br />at the north end of the building to reduce impacts to the residential neighborhood to the <br />north. Window s arc also minimized on the north end of the office building to reduce impacts <br />on neighboring properties. The roof is a standard shingle hip roof with pitch established at <br />5; 1 2 to minimize the impacts of building height. The exterior of the oflice building shall be <br />Page 3 of 14