Laserfiche WebLink
Utt <br />DMpllMn,MN55aS1 <br />Ptowt (962)471-0590 <br />Fac (962) 471-0682 <br />Efivi: <br />•OBBiatininMhahacfMlLffg <br />W9b&:t: <br />«wwnbvNM«aMhj»g <br />- -akaow <br />..-MCkMna <br />LancaFWwr <br />Monica &ON <br />ScoOTtanas <br />RobartSdnoadv <br />0SSi <br />IliiMtaia fraak WatargM iisWct <br />Improving QnMUtj ofWater, Quati^ of Life <br />Et$Mhhedml967 <br />February 13.2003 <br />lennifer Chaput <br />City of Orono <br />P.O.Box66 <br />Long Lake. MN 35356 <br />Dr. Robert Gunmit <br />P.O Box 85 <br />Crystal Bay. NIN 55323 <br />RE: Wetland Alteration at 1100 Old Crystal Bay Road. City of Orono <br />Dear Applicant: <br />This letter is to inform the property owner and City of Orono that afler reviewing a <br />brief project description for the location cited abo>-e. it appears that the project will <br />require pertniu from the Minnehaha Creek Watershed District. Once Uk project <br />design is rinalized, MCWD encourages you to submit an application as soon as <br />possible. Projects of this nature w ill require approval of the MCWD Board of <br />Managen which typically ranges between 30-45 days. Delays in submittals will <br />ultimately result in project delays. <br />Please consult MCWD Rules for guidance on the required exhibits to be submitted <br />with an application. In addition to the items included in the District Rules, the <br />following bulleted items must be submitted as a part of this specific project <br />application: <br />t> Vz- <br />• Rule A: Procedural Requirements <br />1. Submit address labels obtained from Hennepin County which cite the <br />names and addresses of all of the property ownen w ho reside within 600 feet <br />of the project area <br />2 Notification of approval or preliminary approval from the City Council or <br />Planning Commission <br />3. Submit a copy of the Combined Joint Notification Form application <br />(enclosed) <br />• Rule B: Erosion Control <br />1. Plan must sute with detail vegetation and stabilization will occur within <br />48 hours of completed grading <br />2. An erosion control plan must be submitted w ith this application. This <br />includes indication of silt fence and all other necessary erosion control <br />measures, which must be placed on all downhill slopes in areas where <br />grading will occur. <br />• Rule C Roodplain Alteration