My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-19-2023 Planning Packet
Orono
>
Planning Commission
>
2003
>
05-19-2023 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 3:18:01 PM
Creation date
2/9/2023 3:16:16 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 10.03, Subd. 15 (G) (2 c): Lakeshorc lot fencct; Fences shall not be constructed <br />within the defined lakeshore >-ard of a lakeshore lot, i.e. shall not be located wthin 1 50 <br />feet for Natural Environment Lakes. (Request: to allow a fence within 1 SO' of the OH \VL <br />of French Lake where no fences are permitted). <br />Dbcussion: <br />The applicMion is two pronged: to permit the reconstruction of a 1 1* x 122’ gravel pathway for <br />the property owners to access an island of land on their properly; and to allow horses on an <br />intermittent basis on the island. These activities arc not permitted without City approval for <br />variances and a conditional use permit. <br />Pathway Reconstruction <br />Hardcover (0 to 75 ’ setback zone) <br />No hardcoser is permitted within 75’ of the OllWL of any lake. 1 he applicants propose to <br />reconstruct an existing gravel pathway, constituting 1,342 s.f. hardcover, within 75' of the <br />OHWL of French Lake. <br />Grading. Filling and F.xca\oling within 75 ’ of the OHIVL <br />No grading, filling or excavating is permitted w ithin 75* of the OIIWL of French I.ake. The <br />applicants request grading, filling and excavating within 75’ of the OHWL to reconstruct the <br />pathway and to mitigate wetland that is filled as a result of the reconstruction. This will require <br />approximately 2,007 s.f of filling in w etland and 4.037 s.f of wetland mitigation. <br />Movement of >500 cubic yards of Material <br />To reconstruct the pathway, it is anticipated that approximately 147 cubic yards of fill will be <br />required if soil conditions arc acceptable. However, since soils have not been tested, the amount <br />of fill required for the project is uncertain, lliercfore, a conditional use pennit request has been <br />added to the application in case more than 500 cubic yards of material is necessary. <br />*rhe following criteria are used to evaluate a conditional use permit: <br />/. That the proposed location of the conditional use is in accord with the objectives of the <br />Zoning Chapter and the purposes of the district in uhich the site is located and <br />Comprehensive Mimicipai Plan: <br />The proposed conditional use is in accordance with the Zoning Chapter and the <br />Comprehensive Municipal Plan to allow for the property owner to safely access a portion <br />on his property. <br />2 That the proposed location of the conditional use and the proposed condition under <br />which it would be operated or maintained would not be detrimental to the public healdi <br />safety or w elfare, or materially injurious to properties or improvements in the vicinity: <br />and <br />Tlie proposed conditional use will not be detrimental to the public health, safety or <br />welfare or injurious to properties or improvements in the area. <br />S. That the proposed conditional use will comply with each of the applicable provisions of <br />SOI 2869 Dr Robert Cumntt <br />5/U2003 <br />Pate3t^6
The URL can be used to link to this page
Your browser does not support the video tag.