Laserfiche WebLink
r <br />•0x2ns <br />A«igirtl 14. 2003 <br />PaOcSofS <br />•The special conditions applying to the structure or land in question are peculiar <br />to such property or immediately adjoining property." <br />The wetland nature of the shoreline visually suggests a 26 ‘ wetland setback would <br />apply, but in fact this is lakeshore by definition, so the 75'setback applies In the <br />opinion of staff this criterion is not met <br />•The conditions do not apply generally to other land or structures in the district in <br />uhich said land is located." <br />The lakeshore setback and hardcover requirements cqtgdy to all lakeshore lots in <br />the opinion of staff this criterion is not met. <br />"The granting of the application is necessary for the preservation and enjoyment <br />of a substantial property right of the applicant." <br />In the opinion ofstaff this criterion is not met. <br />•The granting of the proposed variance unll not in any way impair health, safety, <br />comfort, morals, or in any other respect be contrary to the intent of the Zoning <br />Code." <br />Structure and hardcover within the 0-75' zone is contrary to the intent of the <br />code In the opinion of staff this criterion is not met <br />•The granting of such variance will not merely serve as a convenience to the <br />applicant, but is neccssao to alleviate demonstrable hardship or difliculty." <br />There are reasonable options that would eliminate the need for variances In the <br />opinion of staff this criterion is not met <br />lisiia for Consideration <br />1 . Should the OH WL setback be applied in this situation? Wetlands immediately <br />lakeward of the 929.4 elevation arc a characteristic typical ofa relatively small <br />portion of Orono s Lal:e Mirutetonka shoreline. <br />2. Have the applicants provided any supportive information that justifies the <br />variances'’ <br />3. Are there any other issues or concerns with this application? <br />Staff Recommendation <br />1 . Approval of the additional structural coverage to accommodate the deck staircase. <br />2. Removal of all plastic or fabric landscape liner in planting beds. <br />3. Removal of all hardcover in the 0-75‘ zone (1 .7 % or 131 s.f. to be removed <br />which includes the shed and retaining walls). <br />4. Removal of the shed in the 0-75* zone. <br />5. Removal of additional hardcover to achieve the approved level of4.464 s.f. per <br />prior approval. This constitutes the driveway that was supposed to be removed <br />per the building permit approval.