My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-17-2003 Planning Packet
Orono
>
Planning Commission
>
2003
>
11-17-2003 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 1:41:41 PM
Creation date
2/9/2023 1:39:39 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
396
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
fis-lffl <br />Staff Ri <br />Staff recomincads approval of the kM line leamngement, subject to the following: <br />1. Applicants to grant a 2ff drainage & utility easement (10* either side of new lot Uoe) to <br />replace the eascmcnu being sacated. <br />2. <br />3. <br />Applicants to provide title opinion to confirm ownership of each property. <br />Planning Commission should address whether the Guest House use should continue to be <br />allowed based on 3 acres dry/] acre wet Ifnot, then q^pUcants should be directed to proceed <br />with removal of its plumbing, or make an application to convert it to an **accessory building <br />with plumbing" and remove any existing kitchen facilities. <br />Planning Omuniaaioa should detennine what the intended use is fix the driveway in Lot 14 <br />connecting to Lot 1 S/I 6; then determine wfaedier any special conditions should be considered <br />for continued use of that secondary access if Lot 14 is sold separately from Lot 15/16. <br />Jito
The URL can be used to link to this page
Your browser does not support the video tag.