My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-18-2003 Planning Packet
Orono
>
Planning Commission
>
2003
>
08-18-2003 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 1:41:31 PM
Creation date
2/9/2023 1:38:56 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
331
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />-I I <br />•U-2919 <br />Angtttt 12,2M3 <br />Hardskip Slatemeal Sk Aaal>*tb <br />Applicants have provided a letter of request including a hardship statement in Exhibit B of the July <br />17 memo, and should be asked for their additional testimony regarding the application. See the July <br />17 memo to re\’ie\v the hardship analysis. <br />Issues for CoasMeraliofl <br />1.How will the proposed slniclurc be used? Is there any intent to use it for a home occupation <br />or other commercial uses? <br />If the setback variance is granted, but the ability to attach the two structures with a <br />greenhouse t>pe building is denied, will the close proximity oflhe tw o structures (11* apart) <br />have the same visual impacts as if the>' were attached? Does the offset of the greenh <br />adequately adu/-ss the potential visual impacts of the west facade? <br />ousc <br />3. <br />4. <br />In cither case, 'jctuuid the building be screened from view from Highway 12? <br />What har^.-/,':kf.s sy pport the ideation of the pool 10’ from the lot lint? What could be done <br />to mitigate ari .saiive impacts of the pool location? <br />How docs the substandard lot area affect your position on the plumbing in accessory building <br />CUP? The code requires that buildings receiving such a CUP be conforming in size and <br />location... <br />6. Docs Planning Commission have any other issues or concerns with this application? <br />Staff Rccommendatioo <br />Staff recommends: <br />a) Approval of the side street setback variance for the 996 s.f garage, based on the need for more <br />storai c and the limitations for other suitable locations imposed by the lot size, required setbacks, <br />sewage system location, wetlands and topography. <br />b) Denial of the variance to create an oversize accessory structure, finding that approval would be <br />in conflict with the intent of the OAS ordinance. <br />c) Denial of the pool setback at 10', but approval for a setback of 15*. Planning Commission should <br />determine whether any vegetative screening or fencing should be required to mitigate the visual <br />impacts of allowing the accessory building and'or the pool in a location nearer the side street lot line <br />than would r rmally be allowed. <br />d) Approval of the plunbing in accessory building CUP subject to the standard conditions.
The URL can be used to link to this page
Your browser does not support the video tag.