My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-18-2003 Planning Packet
Orono
>
Planning Commission
>
2003
>
08-18-2003 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 1:41:31 PM
Creation date
2/9/2023 1:38:56 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
331
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Monday. July 21,2003 <br />6:00 o’clock p.m. <br />(#18 #03-2926 WALTER RINGER JR.. Coatiaacd) <br />Drive (Co. Rd. 51). This land is landlocked except for existing driveway easements through the <br />Murphy property. <br />t. StOTMwater lad Drateage laiprovcmcals aad/ar Easewcats Needed <br />Development of the property will likely require creation of stormwater management facili*ics <br />which may include storm sewers, swales and runoff rate/quality control ponding within the site <br />Again, coordination with the develoomcnt of the Murphy property may be bcncnoial from a <br />feasibility and cost-saving standpoint. The property will be subject to the Stormwater and <br />Drainage Trunk Fee. established currently at S2700 per acre for the 2-acre /one. <br />9. Utllily* Lacalioas and Availability <br />The property would be served by private wells and municipal sewer. Municipal sewer with <br />capacity to serve the small number of units proposed is available in the Crystal B;t, <br />neighborhood just North of North Shore Drive. <br />10. Utility Assessments or Conaectloa Fees <br />Whether a sewer unit connection charge for use of the existing sew er sv siem w ould be re<|uircd <br />of this new development, has >*ct to be determined. The developer w ill be responsible for all <br />costs associated with bringing sewer laterals to serve the proposed new lots, as well as for <br />obuining appropriate easements through the Murphy property for the sew er. <br />11. Lakeshore Proximity and Conformity with Shoreland Regulations <br />Lou 1 and 2 are the only lots which will abut the lakeshore. and the only lots which will have <br />riparian rights. The applicant is not currently proposing any lake access for the non-riparian lots. <br />12. Wetlands On Site and/or Impacted <br />The only apparent wetlands on the site arc those abutting the shoreline of Lake Minnetonka. <br />However, the preliminary plat application should include a completed wetland delineation report <br />to verify that no other wetlands arc present. <br />13. Tree and/or Woodland Impacts <br />Tlic site is heavily wooded with a variety of tree species. Orono does not have a tree <br />preservation ordinance other than within the 0-;5’ lakeshore setback /one. where cicarcutting <br />and removal of trees 6" or greater in diameter is prohibited. The developer is encouraged to <br />preserv e as many trees as possible to retain the w ooded character of the property. <br />PAGE 34 of 37
The URL can be used to link to this page
Your browser does not support the video tag.