My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-16-2003 Planning Packet
Orono
>
Planning Commission
>
2003
>
03-16-2003 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 1:37:22 PM
Creation date
2/9/2023 1:36:06 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Monday, May 19,2003 <br />6:00 o’clock p.m. <br />CJ9 #03-2896 BRUCE BOEDER ON BEHALF OF FRANCISCOS BASTIAENS <br />COOtlDIICO^ <br />The applicant shall, upon completion of the septic system serving the new house on <br />the property, rannect the old house to said new system in a manner acceptable to <br />the City, and discontinue use of the existing septic system serving the guest house <br />structure. <br />^e guest house use shall be allowed only for a period of 24 months beginning with <br />the date of final Council approval of the CUP. At the end of the 24 month period <br />the property owner shall discontinue the guest house use and shall remove the <br />stnicture no later than 30 days after the end of the 24 month period. <br />The existing drive^^•ay connection directly to North Femdale Road may be <br />continued only during the 24 month period for which the guest house use is <br />allowed. Within 30 days after the end of the 24 month period, the driveway <br />connection to North Femdale Road shall be eliminated, and the driveways and <br />entrance regrad^ to permanently eliminate direct vehicle access to North Femdale. <br />Any other conditions the Planning Commission feels are appropriate to ensure <br />compliance with the conditions of approval. <br />With regard to the staff recommendations, Mr. Boeder stated that, since the cxistine <br />s>'stcm was functioning the applicant objected to the requirement that they connect to the <br />new septic system. While the new home would be ready for occupation by July 11 <br />There were no public comments. <br />son*s *^**^*^ applicant intended to remove the home in two years after their <br />Mrs. Bastiaens confirmed that the home would be removed in two years and that no <br />improvements were to be made to the residence during that time. <br />approval Femdale driveway access would be subject to Greg Gappa's <br />Hawn stated that she opposed the application and saw no hardship which would entitle <br />PAGE 30 Of 39
The URL can be used to link to this page
Your browser does not support the video tag.