My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-16-2003 Planning Packet
Orono
>
Planning Commission
>
2003
>
03-16-2003 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 1:37:22 PM
Creation date
2/9/2023 1:36:06 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETLNG <br />Monday, May 19,2003 <br />6:00 o’clock p.m. <br />ROLL <br />The Commission met on the above mentioned date with the following members present: <br />Chair Sandra Smith, Commissioners David Rahn, Liz Hawn, Jearme Mabusth, Cynthia <br />Bremer, Stephanie Zugschwert and late arrival alternate Jule Hannaford. Representing staff <br />were Planning Director Mike Gaffron, Recorder Kristi Anderson, and Council <br />Representative Jim Murphy. <br />Commissioner J. Mark Fritzler was absent. <br />Chair Smith called the meeting to order at 6:05 P.M. <br />CONSENT AGENDA <br />(#1) #03-2891 ERIC AND KAREN PAULSON, 2605 MAPLE RIDGE LANE, <br />VARIANCE <br />Hawn moved. Chair Smith seconded, to recommend approval of Application #03- <br />2891, Eric and Karen Paulson, a variance to permit construction of an in-ground pool <br />that encroaches 32* into the average lakcshore .«vthaeu 'he propert>- located at <br />2605 Maple Ridge Lane. VOTE: Ayes 6, Nays 0. <br />(#2) #03-2892 DANIEL BARTUS, 1001 WILDHURST TRAIU VARIANCE <br />Chris Morgart, 1003 Wildhurst Trail, requested that the item be taken off consent for <br />discussion. He indicated that since the property has been demolished, there has been a trash <br />pile located on the site which has blown trash onto his property. He stated that, as <br />construction continues, he would like some assurance Uiat the encroaching driveway on the <br />property would be changed and asked when a home would be built on the site. <br />Chair Smith removed the item from consent for further discus.sion aPer item #3, in order to <br />give the applicant time to arrive. Furthermore, Smith indicated that, typically, home <br />construction needs to be completed within a certain timeframe or variances expire on a <br />property. <br />Gaffron expected that a home would be built on the site within one year. <br />OLD BUSINESS <br />Since staff was short handed, Mabusth indicated that she w’ould be a non-voting member of <br />the Planning Commission this evening in order to assist Planning Director Gaffron w ith <br />staff memorandum and reports. <br />PAGE I of 39
The URL can be used to link to this page
Your browser does not support the video tag.