Laserfiche WebLink
cmroFORONO <br />OM Long Lako Rood SanRory Sowor Extontion <br />Proliminary Cost Estimate <br />BRA File No. 139^0-127 <br />Pntmin§ryCo9tE^imat9 <br />ITEM UNIT <br />EST. <br />QUANTITY <br />UNIT <br />PRICE <br />EST. <br />COST <br />r HOPE 80R11. directional bore LF 2000 $14.00 $28,000 <br />Sanitary aarvioe. ind. curb stop EA 4 1.500.00 6.000 <br />Fkithlng station connection EA 1 3.000.00 3,000 <br />ConrMCI to existino manhole EA 1 1.000.00 1,000 <br />QaedinQ incL tnpfoll mulch fartPiMOTa wppvwii| i*feiMepvS| iwws* <br />Estimated Construction Cost------—«â€”vonongsnoMS <br />AC 0.5 3.000.00 1.500 <br />$39,500 <br />1.975 <br />PntakmntCm (i-ieo3)jas