My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-27-1978 Planning Packet
Orono
>
Planning Commission
>
1978
>
11-27-1978 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 12:52:29 PM
Creation date
2/9/2023 12:51:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(i <br />.V2 <br />3 <br />#4 • I <br />jsl t_s •a <br />TO:Jeanne Mabusth, Asst. Zoning Administrator <br />FROM:Michael P. Gaffron, Septic System Inspector <br />DATE: <br />SUBJECT: <br />November 16, 1978 <br />Septic System Soil Testing <br />Donald Scott, Longview Second Addition <br />Soil testing data for this s .* division has been reviewed. Orono <br />code requirements for testing have not been totally met. Three <br />(3) borings per lot are required to show the depth to existing <br />and seasonal water table. Only one boring was taken per lot, and <br />in both cases data shows the water table at a 10* depth; the boring <br />logs Indicate no soil mottling; and my Inspection on November !6, 1978 <br />revealed water table at a depth of 3'*6" on lot 1 and 9* on lot 2. <br />Additional borings showing depth to mottling will be required. <br />Orono soli testing requirements and methods are enumerated on the <br />subdivision application forms. The applicant has only to read the <br />Information contained therein to find out what Is required. <br />i <br />e <br />4 ^ »
The URL can be used to link to this page
Your browser does not support the video tag.