Laserfiche WebLink
L . • <br />IW. <br />**• f ’ t <br />« <br />► <br />«■ >. <br />I 7" <br />• • V • • <br />;.S <br />1.' nmaucncii <br />lUt is s prvliaiiiaxy soils evaluation and plan feview of the pro* <br />posed Qrono Osks Addition in the City of Qiono. <br />A deuiled soils Mp for the arw of proposed developMnt is provided <br />with this report. Ihis sep is based on infonation ccntatoed in **Soil <br />Survey of Hniq>in Ooun^* and "Landsopes of Hennq>in County** as well <br />as 197S aerial photogr^ns of the area m'm on-site investigation. <br />Badi of tiw soils nippeil within the proposed developniait <br />described. Favorable and infavorable develoamt ciauract <br />discussed. Explanations of the soil nq> syamls and colo <br />cti^ II and III. <br />is briefly <br />eristics are <br />I*:ed in Sect <br />Ihis is a pralininary soils evaluation and additional atgiii <br />Should be conducted before construction is begua. <br />‘ing tests <br />the pqtontial of the soils eapped for installation of on-site soil treat <br />wmt gyaum is discussed. <br />Areas within tiie proposed developamt area idiich may be classified as <br />public waters or wetlands are indicated. <br />Methods for • • M O rol of nnoff and sedinent fron this site are discussed. <br />II. HOW ID USB nC SOIL MKP <br />needs to M M >1'(t the syabols naan. Ihe soil <br />wyibol consists of three parte arranged as follows: <br />B ’ 2 <br />(Slflpe) Qbrosion)(5»il) <br />tiie degree of erosion. <br />Erosion Leiind <br />* <br />A - <br />B - <br />C - <br />D - 12 to IB percent <br />B - <br />< ’ <br />i ■ r <br />No fllmbol - 0 to 1/3 toneoil <br />2 - 1/S to 2/3 t^eidl loet.3 - <br />lost. <br />\ <br />e • <br />•>v <br />zn.TOES FRBSBir <br />t operative Soil Sunray. <br />area were classified according to the *^il <br />County**, and the sfaiards of the National Oo- <br />Soil ty^ present are: <br />t <br />~ V*-t <br />ii:t^4 <br />JiL